Live news , top stories, corporate news, company news, sector news, economy news, results analysis news, ceo interviews, fund manager interview, advisor interview, market news, bazaar talk, hot stocks news, ipo news, commodities news, mutual fund news, insurance news, news wire
18 April, 2024 16:44 IST
NTPC completes trial operation of Unit-2 of Tanda Super Thermal Power project
Source: IRIS | 06 Apr, 2021, 05.12PM
Rating: NAN / 5 stars.
Comments  |  Post Comment

 NTPC, the country's largest power producer has successfully completed trial operation of Unit-2 of 660 MW capacity of Tanda Super Thermal Power Station, Stage-II (2 x 660 MW) and consequently included in the installed capacity of NTPC Group with effect from Mar.31, 2021.

With this, the total installed capacity of NTPC and NTPC group has become 52385 MW and 65810 MW respectively.

NTPC has recorded its highest ever group generation of 314 BU in FY21, a growth of 8.2% compared to previous year. On a standalone basis, the company generated 270.9 BU in FY21, an increase of 4.3% over the previous year.

NTPC group recorded highest ever single day generation of 1192.42 MU (Group) & 990.65 MU (NTPC). The coal plants registered a PLF of 66% with an Availability factor of 91.43%.

Shares of the company declined Rs 0.15, or 0.14%, to settle  at  Rs 105.95.  The total volume of shares traded  was  421,709 at  the BSE (Tuesday).



 Post Comment
Name Email
Comment
Security Code type    into this box
Related Articles
Home  |   Shares  |   F&O  |   Mutual Funds  |   Loans  |   Insurance  |   News Centre
Wealth Tracker  |   Newsletters  |   Tax Corner  |   NRI Centre  |   Advertise
© All rights reserved. IRIS Business Services Limited
A Disclaimer