Live news , top stories, corporate news, company news, sector news, economy news, results analysis news, ceo interviews, fund manager interview, advisor interview, market news, bazaar talk, hot stocks news, ipo news, commodities news, mutual fund news, insurance news, news wire
25 April, 2024 12:53 IST
NTPC completes trial operation at Unit-2 of Gadarwara Super Thermal Power Project
Source: IRIS | 18 Feb, 2021, 06.15PM
Rating: NAN / 5 stars.
Comments  |  Post Comment

NTPC, the country's largest power producer on February 18 announced that Unit-2 of 800 MW capacity of Gadarwara Super Thermal Power Project has successfully completed trial operation and consequently included in the installed capacity of NTPC.

With this, the total installed capacity of NTPC and NTPC group has become 52110 MW and 64875 MW respectively.    

 

Shares of the company gained Rs 4.05, or 4.08%, to settle  at  Rs 103.40.  The total volume of shares traded  was  25,68,5800 at  the BSE (Thursday). The scrip has touched a 52 week high of Rs. 113.70 on Feb 19, 2020 and a 52 week low of Rs. 74.00 on Mar. 23, 2020.



 Post Comment
Name Email
Comment
Security Code type    into this box
Related Articles
Home  |   Shares  |   F&O  |   Mutual Funds  |   Loans  |   Insurance  |   News Centre
Wealth Tracker  |   Newsletters  |   Tax Corner  |   NRI Centre  |   Advertise
© All rights reserved. IRIS Business Services Limited
A Disclaimer