NTPC has commissioned 225 MW out of 250 MW of Mandsaur Solar Power Project. With this, the installed capacity of NTPC's solar power projects has become 845 MW.
The total installed capacity of NTPC on standalone basis has become 44419 MW and that of NTPC group has become 51635 MW.
Total volume of shares traded on the bourses today was lower by 7.17% to 4,237,659 compared with 22-day average volume of 4,564,724.
Shares of the company gained Rs 1, or 0.62%, to trade at Rs 161.25. The total volume of shares traded was 2,164 at the BSE (9.19 a.m., Monday).